Data blueprint & architecture
Automating reference pricing for procurement
Reference prices set by hand a few times a year cannot track a market that moves weekly. We built the data layer, the formula engine and the control centre that let them move together.
Continuous price reviews, replacing a quarterly cycle.
The challenge
Reference prices, the internal benchmark every tender is judged against, were produced manually. Data was collected by hand from several departments, formulas were reviewed on a fixed schedule of roughly four times a year, and approvals depended on documents moving between teams.
Downstream, buyers chose between market price, last purchase price and reference price largely at their own discretion. When a reference price drifted away from reality, procurements failed, and there was no structured way to feed that failure back into the formula.
What we did
We designed a phased solution and delivered it mock-up first, so scope was agreed before any production code was written.
- Data integration & harmonisation. An orchestration layer collects, extracts and transforms historical reference prices, bid and won prices, bidder counts, material cost drivers and non-material drivers such as transport and labour, plus public external indicators, into one master dataset.
- Configurable formula engine. Pricing formulas are expressed as versioned value objects, so the client's own developers can add, amend or retire a formula without touching the rest of the system.
- A single price control centre. One screen holds the material, the formula cost tree, historical references, the final price decision, remarks and supporting documents, the anchor point for every pricing decision.
- Dashboards and a feedback loop. Success rates by price type, successful versus unsuccessful procurements against the recommended price, and a channel for buyers to report failures back into formula tuning.
Results
- Time: reference prices generated from formulas and consolidated history instead of manual collection.
- Coverage: a far wider set of inputs behind each estimate, including external market indicators.
- User-centric: one consolidated view for the decision, with the reasoning and evidence attached to it.